Rugby Town Hall

Rugby VS-TownHall-3

The 72kWp on Rugby Town Hall had many challenges. Working with Intrinsic Power we had the following issues to overcome: Multiple flat roofs at varying heights A building that had listed status A plant room with all electrical distribution in the basement A very short lead time to meet Government tariff changes We chose Perlight

Estimated Annual Generation: 56,449 kWh

AGD Equipment, Stratford upon Avon

DJI_0389-small

Working with the client over a number of months we designed, supplied & installed a 110kWp Solar PV system using SolarWorld 290w mono-crystalline panels & SMA Tri-Power inverters. There were many challenges on the site. As the business had developed over a number of years there were multiple roofs with no way to connect the

Estimated Annual Generation: 85,512 kWh

Broughton Community Pavilion, Milton Keynes

Broughton_Community_Pavilion

Originally contracted by Greenway & Partners Ltd (GAPL) to design a Solar PV scheme for a Broughton Sports Pavilion in Milton Keynes we designed a 24.68kWp Solar PV system to be installed on the Sedum roof. When the project eventually came to fruition we were contracted to work for Borras Construction Ltd. The project was

Estimated Annual Generation: 19,422kWh

Stratford Agri-Park, Clifford Chambers

solarpv_agripark

Installed in 2012 this 50kWp system generates the electricity that is supplied to the tenants of the 6 industrial units. The landlord’s Solar PV system generates Free, Green electricity which they are able to sell to the tenants. Pre-installation work involved gaining permission from Western Power Distribution to install the system. Estimated to generate 42,301kWh

Estimated Annual Generation: 42,301kWh

Stratford Marina, Stratford-upon-Avon, Warwickshire

case_image_21 (1)

The project involved the ground floor being turned into a coffee shop, office and workshop, with the addition of an apartment in the roof space. We were asked to design an array that integrated into the slate roof. Following consultation with our customer Kyocera 215W panels were chosen in conjunction with a Fronius Invertor.

Estimated Annual Generation: 2,767kWh

Rehabilitation Hospital - Leamington Spa

hospital-study-02

The site had three possible roofs the panels could go on and if using mainstream panels all three roofs would be required. We offered such a design using 200 panels like the other 4 companies offering a tender. On first view this seemed a competitive offering. However, there was further consideration to make. A difference

Estimated Annual Generation: 43,000kWh

Ettington Community Centre

case-study-img

The remit was to provide a system that could generate electricity to provide energy to power the ground source heat pump that heated the building as well as energy during the day for the numerous events that were held there. The main problem was ECC did not have the funds to pay for the supply

Estimated Annual Generation: 24,755 kWh

Yew Tree Farm in Wootton Wawen

solar-pv-roof

The Yew Tree Farm project called for a 50kWp system. The main problem was using mainstream Solar Panels only 40kWp was possible. However, by using SunPower’s World leading efficiency E20 327w panels we only required 152 to achieve a peak output of 49.70kWp. We coupled this with two of the latest generation SMA STP25000TL inverters

Estimated Annual Generation: 37,725 kWh